Client: United States Agency for International Development (USAID)
Dates: 2018 - present
Country of assignment: Kazakhstan, Tajikistan
Description of actual services provided:
Encon provides consulting services under the U.S. Agency for International Development’s Power The Future (PTF) project implemented by Tetra Tech.
Enson analyzed the reasons for the reduced efficiency of CHP-2 in Dushanbe, Tajikistan, and develops proposals aimed at achieving the design performance of CHP-2.
Encon evaluates energy efficiency (EE) opportunities at CHPs in Kazakhstan including the following activities:
- Background information collection and analysis including
 
- Site visiting and examining the selected equipment for potential EE improvements
 - Collecting the requested technical and economic information
 
- Evaluation of energy efficiency opportunities at CHP-1, CHP-2, and CHP-3 in Almaty owned by JSC Almaty Power Plants (JSC AlES), a member of a group of companies owned JSC Samruk-Energy, CHP-2 and CHP-3 in Pavlodar and Ekibastuzskaya CHP in Ekibastuz owned by JSC Pavlodarenergo, Stepnogorskaya CHP in Stepnogorsk, and Sogrinskaya CHP in Ust-Kamenogorsk including
 
- Analyzing the energy efficiency of the CHP's operation (base line identification)
 - Performing modeling and calculations to assess all identified EE measures
 - Proposing EE measures for reducing electricity, heat, fuel, and other operating costs and expenses while increasing reliability
 - Estimating EE investment costs
 - Assessing potential energy, fuel and other operating cost reduction resulted from EE measures
 - Performing costs and benefits analysis for the proposed EE measures
 - Developing a Report summarizing the EE opportunities, including costs and benefits for each CHP, and recommending next steps for implementing the EE opportunities
 
- Preparation of Pre-Feasibility Study (Project Business Plan) for Energy Efficiency Investments at CHP-1, CHP-2, and CHP-3 in Almaty including
 
- Preparing a detailed description of recommended EE measures
 - Assessing energy, fuel and other savings, including reliability benefits
 - Assessing SOx emission reduction and related emission fee decrease
 - Estimating project costs including equipment, material and labor
 - Developing the Activity Based Schedule
 - Proposing a Financing Plan
 - Preparing project cash flow projections
 - Analyzing capital investment decision indicators analysis
 - Performing risk and sensitivity analyses
 - Analyze environmental and other benefits
 - Preparing the Pre-Feasibility Study (Project Business Plan)
 - Marketing the EE investment project to financial institutions, as appropriate and agreed with JSC AlES and JSC Samruk-Energo.